Volume 9, Sudan Part 5: Gebel Barkal and Nuri, 1919, page 4

Item

Title
Volume 9, Sudan Part 5: Gebel Barkal and Nuri, 1919, page 4
Author
Description
Work in B 502 EX 1. Well "C" was cleared to level water and abandoned. Last of R'y embankment removed. Dumping started in area "W" of the railway. Cleared surface debris along "S" wall of B 502 "W" into B 502 EX 2 from B 502 EX 1. Started in B 502 EX 3 working "W". Dumed on old dump "NE" of "NE" corner of B 502. Work on "S" area of B 502 EX 2.
Relation
Mahmud el Hau, Reis; Said, Reis; Jackson, Herbert; Atah; B 502 EX 1; Railway; B 502; B 502 EX 2; B 502 EX 3; sketch of markings on faï head; sketch of flat bronze fragment; sketch of the dump; sketch of small bronze ring; sketch of B 502 EX 2; sketch of B 502 EX 3;
Format
Identifier
8165