Volume 9, Sudan Part 5: Gebel Barkal and Nuri, 1919, page 27
Item
-
Title
-
Volume 9, Sudan Part 5: Gebel Barkal and Nuri, 1919, page 27
-
Description
-
Work continues at pit in B 501 EX 1 to "NE, E, and SE" of old excavations. Drainage gutter found during trenching for new dump that appeared to be associated with building B 1236 or a yet unexcavated building. The dump was diverted slightly "W" to avoid the gutter. Work continued in the "NE" quarter of B 501.
-
Relation
-
B 501 EX 1; B 1236; B 501;
-
Identifier
-
8237